KAR Pipeline — 264 km Water & Gas Corridor Survey by UAV
Drone/UAV survey of a 125 km water pipeline corridor and a 139 km gas pipeline corridor (200 m corridor width), plus underground utility detection using GPR.
125 km
Water corridor
139 km
Gas corridor
200 m
Corridor width
Two long pipeline corridors — 125 km of water and 139 km of gas — needed rapid, survey-grade mapping across remote terrain, together with reliable detection of existing buried services to de-risk the route.
Point Path deployed UAV photogrammetry to capture the full 264 km of corridor at a 200 m width, tying imagery to ground control for survey-grade accuracy, and used Ground Penetrating Radar with locators to detect and map underground utilities.
Results delivered
Survey methods
Technologies
Project location
Kurdistan Region – Iraq
Interactive map integration point — connect your preferred mapping provider here.
Services applied on this project
Let's map the path to your next project.
Tell us what you're building. We'll bring the survey, the design, and the delivery — with the precision your project demands.